Amazon data center
Subsidence · $15M+ losses · 2025


What happened
Amazon data center, completed in late 2023 with over one billion dollars invested, experienced ground subsidence by June 2025, necessitating tens of millions in structural repairs.
What the data showed
This issue was detectable a year earlier, allowing for preventive engineering measures. The analysis also identified ten additional high-value properties in the area at risk of similar failures. One ground issue, eleven vulnerable assets; accumulation risk can come from shared slopes, not just hurricanes.
What it means for insurers.
Accumulation: one ground issue exposing eleven high-value assets. A portfolio-level view reveals shared exposure that single-asset views miss.
Retrospective analysis by Caelus Space. Each case shows when the first warning signs appeared in satellite data; it is not a real-time alert issued at the time.