Before the project
Know the risk before you bind it
See how the ground at the site and around it has behaved over time, whether the risk is normal or already in excess, and what can be done to reduce it.
Continuous monitoring
See risk as it develops
Track ground movement at the project and around it, so engineering teams catch changes early and act before they escalate.
Risk intelligence that improves every decision
Historical analysis plus live monitoring, in one feed.
Higher Quality
Make better-informed decisions with continuous visibility into risk before and throughout construction.
Lower Costs
Reduce costly field inspections - and focus resources where emerging risk demands attention.
Higher Efficiency
Monitor the entire site and surrounding areas continuously, beyond localized field surveys with limited coverage.
Independent Data
Get an objective, independent view of geotechnical risk - consistently across every site and project.
Purpose: a visual that helps convey the message - normal vs excess risk, and what to do about it
Normal, or excess?
Before binding, Caelus analyzes the historical ground behavior of the site and its surroundings, showing whether the risk is normal or already in excess, and what can be done to reduce it. During the policy, continuous monitoring follows the site and sends alerts when the risk level changes.
The clues were there.
We could have seen it months in advance: retrospective analysis of real failures, using satellite data that already existed.
Hospital sinkhole
A sinkhole closed a major medical center. The warning was already in the ground.
Retaining wall
Early detection let the municipality act before the wall that supports 20 homes failed.
Millennium Tower, SF
Instability showed in the data about three years before the foundation reconstruction began.
Data center
Detectable a year ahead, along with ten more high-value assets in the same area: accumulation risk.
Curious what’s under your next project?
Pick an asset or project site. We’ll scan it from space and send you a real ground-risk report, free.
Scan AssetQuestions from risk engineers
Does this replace field inspections?
No. It helps you decide where to send a surveyor and reduces how often you need to, while engineering judgment stays with your team.
What do we need to provide?
The locations of the assets or projects you want to assess, as addresses or coordinates. No hardware, site visits or access permissions are needed.
What do we get for each site?
A geotechnical risk view of the site and its surroundings, with the type of failure and how it is developing.
Can we see the ground conditions before a project starts?
Yes. The satellite archive is continuous from 2015 worldwide, so Caelus can reconstruct roughly a decade of movement history across the project site and surrounding area before you commit resources.
Can it monitor a project during construction?
Yes. The project and its surroundings are tracked continuously, so emerging ground movement shows up as it develops and engineering teams can respond before it escalates.
How often is the data updated?
Satellites image every point on Earth every few days, so movement is tracked continuously.
How is this different from field surveys or on-site sensors?
A survey captures one moment at one site, and a sensor covers one structure. Satellite monitoring covers the whole site and its surroundings continuously, with archive data, at a lower cost per site.
Does it work in any conditions?
Yes. It sees through cloud cover and works at night, so coverage is global and not affected by weather.
How accurate is the measurement?
Displacement is measured with an accuracy of up to 2 millimeters, precise enough to detect slow deformation that precedes visible damage.
